Here's some photos of the updates until February

We doubled up some of the electrical outlets in key spots. It's nice to have extra outlets near a TV or the bed.
There was a miscalulation for a required door height of 6'8 so we cut through a steel beam and built a supporting wall to replace the load-bearing beam.
We're adding a broom closet in a space that was previously empty.
Using this closet as a freezer. Needed to add an electrical outlet when the electrical was installed.
Ducts were added along the existing beam in the basement.
One of the basement bedrooms. Will add the egress windows when they arrive.
View from the kitchen.
View from the dining room.
We finally decided to close in the kitchen with a wall.
Photoshopped wall.
Photoshopped wall.